Our Projects
BUilt with Dirt & Grit
From grading and underground utilities to full site development, our projects reflect the hard work, coordination, and field experience behind heavy civil construction across Arizona. Check out some of our recent work below.
horne hyundai dealership
Mesa, AZ
This project encompassed complete clearing and grubbing, removal of existing structures and debris, and mass grading across the full 10-acre site for the new Horne Hyundai Dealership in Mesa, Arizona. The scope of work also included the import, placement, and compaction of approximately 30,000 cubic yards of clean fill to prepare the site for development.
San Carlos Irrigation District
Coolidge, AZ
This project involved the rehabilitation of the Florence–Casa Grande Canal Reach 3, for the San Carlos Irrigation and Drainage District in Coolidge, Arizona. The scope of work included demolition, excavation, and installation of open-channel canal systems, as well as the addition of updated automated control structures to improve system performance and reliability.
Nox
Mesa, AZ
This project involved comprehensive site development, including mass grading, over-excavation and recompaction of building foundations, lime stabilization of building pads, and subgrade preparation for building areas, parking, sidewalks, and site features. Paving improvements included placement of aggregate base course and asphalt to support site access and circulation. The project also includes installation of private fire line, water, sewer, and storm drain systems across the site. Utility improvements consisted of hundreds of linear feet of piping, fire hydrants, backflow preventers, lift station installation, storm drain structures, and associated infrastructure to support site drainage and functionality.
Sentry Garages
Queen Creek, AZ
This project included large-scale earthwork, paving, and underground utility installation. The scope included clearing and grubbing, mass grading, cut and fill operations, over-excavation and recompaction of building pads, lime stabilization, and full subgrade preparation for building areas, pavement, sidewalks, and site features. Paving included placement of aggregate base course, asphalt paving, and striping. Fire line, domestic water, sewer, and storm drain systems were also installed, along with associated infrastructure such as hydrants, backflow preventers, manholes, clean outs, and drainage structures.